Vegreville, Alberta
The Vegreville, Alberta BDO Zone for Wheat Straw is rated ‘A’.
Rating Issue Date: July 23, 2024.
'A' ratings denote high prospective viability of Feedstock Supply and Infrastructure and low expectations of default risk in the Zone. Capacity to support new biobased plant operations is considered strong.
Vegreville, AB holds an investment-grade BDO Zone ‘A’ Rating for Wheat straw. Issued in Jul 2024, the rating certifies approximately 910,000 gt/yr of reliable, low-risk biomass feedstock available within a Maximum transport distance is based on a 120-km driving distance from the centre point (Vegreville, AB).
A ‘A’ rating is an investment grade rating, signalling a reliable, low-risk feedstock supply. It signals to developers, lenders, and investors that Vegreville, AB’s feedstock supply has undergone rigorous, standardized due diligence across 100+ risk indicators, the same framework applied to every BDO Zone across North America.
Every BDO Zone Rating assesses a region across three dimensions, mapped as expanding radii around a candidate site.
- Feedstock surplus: Data indicating at least 50,000 tonnes per year of excess feedstock available to support typical intake of new biofuels manufacturing plants.
- Supply chain strength: Evidence supporting long-term commitment to supply both quantity and quality by local farmers, forestry companies, food waste generators, haulers and municipalities.
- Sound infrastructure: Suitable transportation, logistic, operating and supporting infrastructure to meet the requirements for new facility operations.
Assets & liabilities
- Long history of wheat production, supported by experienced growers with expertise in wheat straw harvesting and collection
- Limited competition for wheat straw
- Wheat growers' support and willingness to participate in commercial biomass projects due to high wheat straw yield
- Existing, underutilized fleet of harvest and transportation equipment presents an operational starting point
- Short and variable straw harvest window increases operational and feedstock quality risks
- Most baling equipment owned by livestock producers with little incentive to participate in supply chain
- Existing harvest fleet will likely need to be upgraded to meet quality specifications of future biomass projects
- Greenfield industrial site requires upgrading major infrastructures such as electricity and natural gas
Infrastructure & sites
- 72 acres, 17 fully serviced lots (1.5 to 22 acres), $50,000 per acre
- Along Highway 16A, near Trans-Canada Highway 16 & Highway 36
- Access to key north-south high-load corridor that connects directly to the U.S.
- High-capacity natural gas, electricity, water, wastewater services
- TELUS Fibre Optic Internet, CN Rail, municipal airport
- 1 hour from Edmonton International Airport
- Access to agricultural lands & international markets
- At intersection of Highway 16 & Highway 36 (Eastern Alberta Trade Corridor)
- Immediate proximity to Canadian National Railway (CNR)
- 1,360 acres Greenfield for industrial development
- 120 acres Greenfield for future commercial development
- Area Structure Plan (ASP) completed
- Independent or scalable communal water/wastewater systems, regional water line 2.5 km away
- 1 MVA existing 3-Phase electrical capacity
- 300 acres Greenfield, adjacent to Highway 16 (Yellowhead)
- Area Structure Plan (ASP) completed, including biophysical, geotechnical, stormwater, and servicing plans
- Access to MCSNet fiber optic cable
- 840 acres Greenfield, adjacent to CN Railway and Highway 16 (Yellowhead)
- Area Structure Plan (ASP) completed, including biophysical, stormwater, and servicing plans
- 5 MVA existing 3-Phase electrical capacity
- 32 acres of industrial land
- Located in the northwest corner of the Town of Two Hills
- Close access to Highway 36 and Highway 45
- Currently unserviced, but easily serviceable with water and sewer
- 3-phase power available in close proximity
- Water and sewer installation managed by the Town of Two Hills, ensuring no construction delays
- Adjacent to the Vermilion Airport
- Accessible from highway 41 and twinned highway 16
- Fully developed lots currently on sale for $50,000 per acre including off-site levies
- All utilities to the property line
- Adjacent to twinned Yellowhead Highway 16
- Fully developed lots currently on sale for $50,000 per acre including off-site levies
- All utilities to the property line
- 76.75 acres (+/-), future highway commercial & industrial land
- Heartland industrial land, vendor financing available
- CN Rail line on site with spur possibility
- Vendor willing to sell smaller portions (min. 20 acres)
- Suitable for heavy industrial, energy, agri-business, transportation, logistics, & distribution
- Power: Significant capacity from Fortis and Battle River Power Co-Operative
- Natural gas: Serviced by ATCO and Lamco gas
- Process water: 12 million m3 capacity from North Saskatchewan River (pending)
- Potable water: Sufficient capacity, expandable
- Roads: Major and secondary paved highways, high load corridor
- Stormwater: Master plan in development
- Sewer: Study completed for lagoon system expansion
- Wastewater: Options for expanded lagoon or water return pipeline
- Part of Alberta's Industrial Heartland
- Access to key transportation routes
- Highway 15 and Hwy 831 on the corner of two major high load corridors
- 27.5 Acres (+/-) approved for heavy industrial
- Located in Alberta's Industrial Heartland region, minutes to the Town of Lamont
- Adjacent to the CN Rail line
- Direct exposure to Highway 15
- Favourable tax structure in the Heartland allows for business growth
- Municipal Tax Incentives for agricultural processing projects worth $50 million dollars in capital value
- Asking Price of $536,250
- Zoning is IHH Heavy Industrial
- Immediate possession
- 110 acres (445,154 sq. metres) of developable land, subdivisible
- Located at 75 Avenue and 62 Street (53.299461, -110.053544)
- Medium Industrial (I2) & Urban Transition (UT) zoning
- Hill Industrial Area Structure Plan complete
- 24-hour truck route access, 2.5 km to major 4-lane highways
- ATCO Electricity: ~50 MVA capacity from 751S Hill substation
- ATCO Natural Gas: Industrial-grade line on north property
- City water and wastewater infrastructure
- TELUS PureFibre Optic
- Access to CN and CP rail networks via CPCK transnational system
- Clean site with no environmental concerns or wetland restrictions
- 2.4 to 3.48 acre fully serviced lots, available for consolidation
- Located at 75 Avenue and 62 Street (53.300198, -110.050529)
- Medium Industrial (I2) zoning
- Hill Industrial Area Structure Plan complete
- 24-hour truck route access, 2.5 km to major 4-lane highways
- ATCO Electricity: ~50 MVA capacity from 751S Hill substation
- ATCO Natural Gas: Industrial-grade line on north property
- City water and wastewater infrastructure
- TELUS PureFibre Optic
- Strategic rail access to CN and CP networks via CPCK syste
- Environmentally clean site with no impediments
Local grants & incentives
- Bio-Industrial Opportunities Section (Government of Alberta)
- Agri-Food and Bioindustrial Innovation Program (Alberta Innovates)
- Emerging Opportunities Program (Government of Alberta)
- Non-Residential Tax Incentive Program (County of Minburn)
- Vegreville Incentives: Machinery & Equipment Tax Exemption
- Small Business Tax Rate
- Non-Residential Development Incentive Program
- Local Business Signage Incentive
- Town of Two Hills Incentives
- Lamont County Incentives
Contacts



BDO ZoneCONNECT Webinar
Additional information
- PDFPress Release
- PDFInfrastructure Profile
- PDFCrossRoads Industrial Park Brochure
- PDFWest Industrial Park Brochure
- PDFEast Industrial Park Brochure
- PDFCity of Lloydminster Profile
- PDFLloydminster Transportation & Rail Maps
- PDFHill Industrial Phase 7-3
- PDFHill Industrial Phase 8-1